To facilitate the Oyster Bay property development project, the MTR Corporation is constructing Oyster Bay Station on the Tung Chung Line, providing this new community with convenient train service.
Oyster Bay Station will be located between the existing Sunny Bay and Tung Chung stations on the Tung Chung Line. The works have commenced since late 2023, with the aim of opening the new station in 2030 when the first batch of residents move in.
Benefits
Bringing convenient railway service to the new community
Expanding the coverage of sustainable, low-carbon railway transportation
The Oyster Bay Station project includes construction of the new station, track diversion works, as well as modification of certain depot facilities and other related preparatory works.
Works Progress (Updated in September 2024)
The following works are being carried out for the Oyster Bay Station:
Construction of the southern structure of the Oyster Bay Station
Preparation for the relevant track diversion works
Environment Protection
The Corporation attaches great importance to and has given due consideration to environmental protection factors in the design and construction of Oyster Bay Station*, to minimise the impact of the project on the surrounding environment while ensuring compliance with the relevant statutory requirements.
Environmental Impact Assessment
The Corporation has appointed a consultant to conduct the Environmental Impact Assessment Study for the project to ensure its design, construction and future operation will comply with the relevant requirements in accordance with the Environmental Impact Assessment Ordinance (EIAO). Mitigation measures will also be put in place as appropriate to minimise works impact on the public and environment. The Environmental Impact Assessment (EIA) report has been approved by the Environmental Protection Department and the Environment Permit (EP) has been issued for the project.
Environmental reports related to the Oyster Bay Station* project
*The name “Siu Ho Wan Station” (SHO) formerly adopted in the EIA Report had been renamed as “Oyster Bay Station” (OYB)
Environmental Monitoring
The Corporation will conduct environmental impact monitoring in accordance with the Environmental Monitoring and Audit Manual during the construction period. The monitoring data and monthly reports will be submitted to the Environmental Protection Department and made available for public viewing.
View the regular monitoring data and monthly report (English only)
Mailing : MTR Corporation Limited, GPO Box 9916, Hong Kong
MTR Projects Hotline : 2993 3333 During non-office hours or when the lines are busy, incoming calls will be diverted to voice mail system, which callers can leave messages, and hotline staff will follow up as soon as possible.
*This website is not intended for promoting the sale of any property. This website should not be relied on for any other use or purpose whatsoever. Some images in this website may not be taken from the subject project or its vicinity. The subject project is still in the design or construction stage. MTR Corporation Limited reserves its right to alter the design and plans of the subject project from time to time, which shall be subject to the final approval of the relevant Government authorities. The surrounding environment of the subject project may also change from time to time. All contents of this website are for reference only and shall not constitute any offer, representation, undertaking or warranty.